1.____________ is the maximum rate of output for a process.
2. ____________ is the degree to which equipment space or labor is currently being used.
3. ____________ capacity is the maximum output that a process or facility can achieve under ideal conditions.
4. A(n) ____________ is an operation that has the lowest effective capacity of any operation in the process and thus
limits the system%u2019s output.
5. ____________ is the total time taken from the start to the finish of a process.
6. Variability of a firm%u2019s workload may create ____________.