A production process at Kenneth Day Manufacturing is shown inthe following figure. The drilling operation occurs separatelyfrom and simultaneously with the sawing and sanding operations. Aproduct needs to go through only one of the three assemblyoperations (the operations are in parallel). a) Which operation isthe bottleneck? b) What is the bottleneck time? c) What is thethroughput time of the overall system? d) If the firm operates 8hours per day 20 days p