CIVE5695 Design of Traffic Control Elements
Assignment 1 (40% of total assessment)
Write a report to develop a worksite traffic management plan for a four-lane two-way arterial road. In you plan include:
The eight steps of worksite traffic management processes
The location of lead vehicle work vehicle shadow vehicle and tall vehicle
Different traffic control elements specifying their dimensions
Appropriate drawing tools such as AutoCAD (drawings on the road and where vehicles will be placed)
Please use all Australian standards and codes
Attachments: