Goldratts rule of production scheduling include all but:A. Do not balance the capacity balance the flowB. Utilization and activation of a resource is not thesame thingC. Priorities can be set only by examining the systemsconstraintsD. An hour saved at a non-bottleneck is a mirageE. A process batch should be fixed both along its routeand in time