PRODUCTION LAYOUT PROBLEM. ABC Corporation is planning to assemble a lawnmower using an assembly line. The following table provides the job elements and their
precedence elements and the element times.
1.Draw the precedence diagram of this assembly job. ( See PGS 347-356 13th ed page 229-232 12th ed of your text book Exhibit 10 10.610.9 13th ed 7A9101112
of 12th ed.)
2.If the production requirement for the lawnmower is 500 units per 8 hour shift what will be the speed of this assembly line?
(Line speed = Time allotted per shift in seconds/no. of units produced per shift)
3.How many work stations will be needed to assemble the desired number of lawn mowers per shift?