Draft the final 4- to 6-page section of the paper.Include the following: Testing process summary: Define a test plan or script thatidentifies major software functionality and hardware to be testedwith the required outcomes. Installation process and training plan summary: Provide a timeline that identifies the specific stepsincluding trainingandrelated resources required to implement the recommended system.Include a narrative explanation that discusses the effects ofproject constraints such as time and conversion method andinclude a description of the recommended training plan. Documentation plan summary: Specify and explain each type ofdocumentation required for ongoing technical and user support forthe proposed system. Support and maintenance plan summary: Provide a plan thatoutlines responsibilities and related resourcessoftware hardwareand networksnecessary to support and maintain the proposedsystem.Finalize the paper.