Using the information presented in the following table identify the processing sequence that would result using (1) FCFS (2) SPT (3) EDD and (4)CR. For each methoddetermine (1) average job flow time (2) average job tardiness and (3) average
number of jobs in the system. Jobs are listed in order of arrival. Hint: First determine the total job time for each job by computing the total processing time for the job and then adding
in the setup time. All times and due dates are in hours Job ProcessingTime per Unit Units per Job Setup Time Due Date A. .14 45 0.7 4 B .25 14 0.5 10 C .10 18 0.2 12 D .25 40 1.0 20 E .10 75 0.5 15